List of the surveyed large objects:
- Gas pipeline Uzbekistan-China I-II-III lines (executive survey);
- Highway M39 100 km (comprehensive construction support);
- Water conduit of the Syrdarya region 200 km (large-scale topographic survey);
- Water conduit of Bukhara region 2500 km (large-scale topographic survey);
- Arrangement of GISSAR (comprehensive construction support);
- Highway A-373 (comprehensive construction support);
- Highway M-34 (large-scale topographic survey);
- SYR-3 land reclamation (topographic survey with compilation of longitudinal and transverse profiles);
- ISB – Fergana irrigation system (topographic survey with longitudinal and transverse profiles);
- Stakeout of geophysical profiles in GISAR;
- Construction of the Kandym GPP (comprehensive construction support);
- Construction of the Turakurgan CCGT with a capacity of 2×450 MW, located in the Turakurgan district of the Namangan region (engineering survey);
- Construction of the Navoi-2 450MW CCGT located on the territory of the Navoi Thermal Power Plant in the Karmaninsky district of the Navoi region (engineering survey);
- Construction of the ski resort “Amirsoy” (engineering survey);
- “Muruntau quarry mining” V stage (topographic survey);
- Construction of the Navoi-2 450MW CCGT, located on the territory of the Navoi Thermal Power Plant in the Karmaninsky district of the Navoi region (water drawdown);
- “Survey of nearby areas to the Mustakillikning 25 yilligi field (engineering survey);
- Development of the Chandyr group of fields (engineering survey);
- Development of the Akchalak group of fields (engineering survey);
- Construction of the Pskom reservoir (engineering survey);
- Early gas of the Kandym group of fields and development of the northern part of Shada. I start-up complex (executive topogeodetic survey);
- Construction site of the project Expansion of the production capacity of the Shurtan GKH (topographic works);
- Construction of a solar power plant in the Navoi region (engineering survey);
- Construction of the Syrdarya CCGT with a capacity of 4x650MB, located in the Shirinsky district of the Syrdarya region, the Republic of Uzbekistan (engineering survey).